Construction Methods

/Construction Methods
Construction Methods2017-07-15T14:17:14+00:00

Construction Methods

Sealed Buildings:

  • Closure Strips at all junctures.
  • Sheeting “Runs” Below Outside of Concrete Slab. (Protects Against Environmental Intrusions)
  • Steel Posts Anchored in Concrete 12″ X 36″ Deep. (Preferred Method)
Posts Being Anchored in the Ground

Posts Being Anchored in the Ground

Posts Being Anchored in the Ground

Finished Posts Anchored in Concrete

Posts Being Anchored in the Ground

Building Posts Anchored Before Being Built

Posts Being Anchored in the Ground

Building Posts Anchored Before Being Built

Posts Being Anchored in the Ground

Building Built with Sheeting “Run”
Below Outside of Concrete Slab.

Posts Being Anchored in the Ground

Delivery of materials always included.

Posts Being Anchored in the Ground

Posts anchored into Concrete

Posts Being Anchored in the Ground

Rail System (Red Headed) into Concrete

Posts Being Anchored in the Ground

Entry doors and windows framed with steel.

Posts Being Anchored in the Ground

Posts Being Anchored in the Ground

Posts Being Anchored in the Ground

Posts Being Anchored in the Ground

Posts Being Anchored in the Ground

Posts Being Anchored in the Ground

Posts Being Anchored in the Ground

Posts Being Anchored in the Ground

Posts Being Anchored in the Ground

Posts Being Anchored in the Ground

Posts Being Anchored in the Ground

Posts Being Anchored in the Ground